Pembury Construction brochure




enquiries@pembury.biz     01883 716711

Healthcare and Hospital Projects

Project: New 3T MRI and Casualty Plus Suite with associated works
Client: Hospital of St Johns & St Elizabeth
Value Range: £550,000
Duration: 16 weeks overall

These projects were secured following open market competitive tender and it was decided to phase and combine the projects due to their close proximity.… The project involved strip out works, structural remodelling, diversion of existing services, new construction installation and full fitting out before client phased handovers.Works were also coordinated with the MRI scanner specialist contractor Siemens.
For full project details click here
Project: Basement Offices, IT Suite and Medical Records
Client: Hospital of St Johns & St Elizabeth
Value Range: £200,000
Duration: 8 weeks

These projects were secured following open market competitive tender and it was decided to phase and combine the projects due to their close proximity. This enabled the contractor to modify the detailed phasing programme, in conjunction with the on site client departments, to minimise the disruption arising from construction works for the client, who's operations were maintained throughout….
For full project details click here
Project: Wanstead Place Health Centre and The Diabetic Centre
Client: Redbridge PCT
Value Range: £250,000
Duration: 10 weeks (including works out of hours)

Wanstead Place involved a general strip out of the existing kitchen, electrical and heating systems, and structural remodelling of the reception area. The new works included; reception area and counter, new heating services, kitchen, full
rewiring for small power, data, fire alarm, intruder and lighting. New flooring and
decorations throughout.… The Diabetic Centre works were focused on the provision of a new reception area with new counter, fire shutters, data, lighting and small power. Also decorations and new flooring.…
For full project details click here
Project: Stem Cell Unit conversion and refurbishment - Edgware Community Hospital
Client: Barnet Primary Care NHS Trust
Value Range: £70,000
Duration: 4 weeks

This project consisted of a full internal refurbishment programme to accommodate a 'change in use' to air conditioned offices. Internally, prior to install works, the area was deep cleaned with decommissioning of specialist plant equipment.… Work included new offices, kitchenette, toilets, server/print room, new heating and lighting throughout.…
For full project details click here
Project: Patients cafeteria, dinning room and internet cafe
Client: West London Mental Health NHS Trust
Value Range: £400,000
Duration: 20 weeks

The works involved the construction of two separate single storey extensions within enclosed courtyards to form an internet cafe and separate dinning hall, internal alterations to existing building to form a cafeteria and ancillary accommodation…. The staff and patients remained in occupation surrounding the courtyards for the duration of the project….
For full project details click here
Project: Upgrade of theTrevor Gibbens Unit
Client: Kent and Medway NHS and Social Care Partnership Trust
Value Range: £800,000
Duration: 20 weeks

Trevor Gibbens is a medium secure unit. The project involved new external security fencing with 'Alumasc' eaves and gutter protection, lighting, CCTV, internal locking system, 'Pinpoint' attack and nurse call system, 'Crime Shield' protective screens, new 'KABA' entrance doors and screens, new mains power supply, internal doors, redecoration, ….
For full project details click here
Project: Internal refurbishment of Health Centre at Fullwell Cross, Ilford, Essex
Client: Redbridge PCT
Value Range: £95,000
Duration: 8 weeks (mainly night works/weekends)

The works included the replacement of the existing reception counter, new partitioning, suspended ceiling, lighting, data, power, induction loops, replacement kitchen, new flooring, redecoration….
For full project details click here
Project: Internal alterations and refurbishment
Client: Central and North West London NHS Foundation Trust
Value Range: £100,000
Duration: 9 weeks

The adaptation and refurbishment of the ground and first floor of the existing clinic to provide office space for new Child and Adolescent Mental Health Services. The works included removal of existing partitions, inserting new steel beams and columns, adapting mechanical and electrical services, new reception area, flooring, decoration and two new windows on external elavation….
For full project details click here
Project: Office refurbishment in Bromley and Bexleyheath, Kent
Client: Oxleas NHS Foundation Trust
Value Range: Combined £100,000
Duration: 4 weeks each

Pembury successfully tendered for the office refurbishment in two separate buildings. The works involved the demolition of load bearing masonary partitions, new steel works within the buildings, new partitioning, suspended ceilings, lighting, data, small power, fire and intruder alarms, flooring and redecoration….
For full project details click here
Project: External works
Client: Redbridge PCT
Value Range: £100,000
Duration: 8 weeks

The works involved the removal and reinstatement of 900 square meters of car parking, fencing, new bin store construction, traffic entry barrier, external lighting, repairs, decoration to external windows and doors, lamp posts, road markings. The centre remained operational through out the complete project, with works phased to avoid disruption to patients and staff….
For full project details click here
Project: Internal refurbishment of a doctors surgery
Client: NHS City and Hackney
Value Range: £90,000
Duration: 4 weeks

The works included internal strip out, new partitions, floor coverings, new sterile WHB, worktops, new kitchen and bathrooms, redecoration, minor small power, lighting, alarms, gym area. The building was vacant over three floors and we had upto twenty-five opertives working to complete….
For full project details click here

Project: Various projects at Oakleigh Road Health Centre, Oaklane Children's Centre and Edgware Community Hospial - Walk in Centre
Client: Barnet PCT NHS Trust
Value Range: £11,000 to £35,000
Duration: As programmed

Works included: Oakleigh Road Health Centre – the remodelling of the entrance area, a new reception area and refurbishment works to consultant and treatment rooms. The works were carried out whilst maintaing full client operational services. Oaklane Children's Centre – the main roofs were prepared and relaid. Edgware Community Hospital – renewal of base screed and soft flooring.
For full project details click here

Oakleigh Road Health Centre

Project: Internal and external refurbishment and fit out of Nash College, Bromely, Kent
Client: Liability, the new face of John Grooms and the Shaftsbury Society
Value Range: £270,000
Duration: 10 weeks

The project was secured following an open market competive tender against 4 other contractors. The works included demolition of concrete canopies; removal of asbestos; complete strip out of reception, communial areas and 18 bathrooms used by disabled students; replacement new windows; complete render of external elevations; refurbishment of bathrooms; new reception; decoration; lighting; ventilation and air conditioning.
For full project details click here

Nash College, Bromely, Kent

Project: External facade refurbishment of Nash College, Bromely, kent
Client: Liability, the new face of John Grooms and the Shaftsbury Society
Value Range: £110,000
Duration: 4 weeks

The project involved the removal of existing Crittal windows and replacement with new UPVC; complete render of external elevations with one coat Webber Render; new fascia, guttering and down pipes; brick cleaning; redecoration; new signage, lighting and services; curtain walling; lightening conductor works.
For full project details click here

Nash College, Bromely, Kent

Project: Forming structural openings (Nash College, Bromely, Kent)
Client: Liability, the new face of John Grooms and the Shaftsbury Society
Value Range: £20,000
Duration: 1 week

The project involved the soft strip of existing fixtures and relocation of gas, water and electrical services; forming a 4 meter wide structural opening through a 500mm wide load bearing masonry wall; support of existing structural slabs, "temporary works design" and a saw cut trench through ground floor slab; a steel box beam was installed and temporary propping removed.
For full project details click here

Nash College, Bromely, Kent

Project: Kitchen
Client: NHS Trust
Value Range: £53,000
Duration: 2 weeks

The project involved the removal of existing kitchen, design and install complete new industrial kitchen, new Altro white rock walling and flooring, redecoration & carpentry items, new electric, small power and ventilation.
For full project details click here

NHS Trust

Project: Alterations to Intensive Care Unit and Coronary Care Unit
Client: Maidstone and Tunbridge Wells NHS Trust
Value Range: £60,000
Duration: Phased over 8 weeks

The work included alteration to the existing 3 bed ICU, modify and construct segregation room, alter electrical services, mechanical and piped medical gases and additional CCU bed space.
For full project details click here

Maidstone and Tunbridge Wells NHS Trust

Project: The refurbishment of offices, kitchens, and rest rooms
Client: NHS Mental Health Trust
Value Range: £40,000
Duration: 3 weeks

The work included stripping out of walls, doors, ceilings, floors, mechanical & electrical services, installing partitions, kitchen, floors, ceilings, electrics, nurse call and alarm systems.
For full project details click here

NHS Mental Health Trust

Project: New bin stores
Client: Oxleas NHS Trust
Value Range: £60,000
Duration: 6 weeks

The project was secured following a traditional competitive tender with 4 other contractors. The project included the removal of existing structures, new foundations, rerouting deep drainage, electrical services, brick work and trussed roof.
For full project details click here

Oxleas NHS Trust

Projects: Mill Hill Clinic, Holly Park Clinic and Edgware Community Hospital / Oakleigh Road Health Centre / Westgate Annexe Roof
Client: Barnet PCT
Value Range: £5,000 to £55,000
Duration: As programmed

Pembury were awarded a number of contracts after competitive tenders. The works varied from refurbishment to replacement roof covering.
For full project details click here

Barnet Primary Healthcare NHS Trust

Project: The Project Surgery
Client: The Project Surgery (Newham PCT NHS)
Value: £120,000
Duration: 24 weeks

The works consisted of a fully fitted out two storey extention and external landscaping to the existing premises. All the works completed with the surgery remaining open. Completed to budget and ahead of programme.
For full project details click here

The Project Surgery (Newham NHS PCT)

Project: Refurbishment of Piercy Day Hospital
Client: Camden & Islington NHS Foundation Trust
Value: £60,000
Duration: 4 weeks

The refurbishment of various consultants offices and the construction of a multi purpose day room. The works were carried out in occupation, with great care to respect the well being of day patients and staff.
For full project details click here

Piercy Day Hospital

Projects: Structual alterations to E Block
Client: West London Mental Health NHS Trust
Value Range: £65,000
Duration: 4 week

Pembury successfully tendered for the structual refurbishment of the vacant E Block at St Bernard's wing of Ealing Hospital.
For full project details click here

West London Mental Health NHS Trust

Project: Refurbishment of Ward, Kent and Sussex Hospital
Client: Maidstone and Tunbridge Wells NHS Trust
Value: £75,000
Duration: 5 weeks

The project was completed in normal hours, with occupied and functional wards below and adjacent. The reduction of noise, dust and vibration was of great concern.
For full project details click here

Kent and Sussex Hospital

Projects: Refurbishments of Ante Natal Ward / Paediatrics Offices / Communicatiions Centre / Neo Natal ward / Microbiology
Client: The Whittington Hospital NHS Trust
Value Range: £5,000 to £60,000
Duration: As programmed

Invited by the Estates & Facilities Directorate to tender for a range of refurbishments and successfully secured a number of contracts.
For full project details click here

The Whittington Hospital NHS Trust

Projects: Various projects at Medic House Surgery and South Green Surgery
Client: South West Essex NHS PCT
Value Range: £1,000 to £15,000
Duration: As scheduled

The works included site clearance, concrete repairs to the car park and service yards, repairs to existing timber fences and installation of new steel security fencing and gates.
For full project details click here

South West Essex NHS PCT

Project: New Renal Unit
Client: Hospital of St John & St Elizabeth
Value: £500,000
Duration: 10 weeks

This turnkey project was awarded to Pembury after competitive tendering. The works included complete strip out of all engineering services, existing water plant, toilets, workshop, ward area, nurse stations and kitchenette. The supply and installation of new water treatment plant room, reception area, kitchenette, new Flatwall media panels, lighting, suspended ceiling, glazed screens, solid partitioning and soft flooring.
For full project details click here

New renal unit at Hospital of St John and Elizabeth

Project: Pathology Department Refurbishment
Client: Hospital of St John & St Elizabeth
Value: £65,000
Duration: 6 weeks

The project was carried out in several phases, to allow the Pathology Department to continue its normal day to day activities.
For full project details click here

St John and Elizabeth Hospital Pathology Department

Project: New Admissions Office
Client: Hospital of St John & St Elizabeth
Value: £30,000
Duration: Out of hours working over 2 weekends

Pembury were asked by the Estates Department of Hospital of St John & St Elizabeth to space plan and fully refurbish the existing Admissions Office.
For full project details click here

Estates Management at Hospital of St John and Elizabeth, London

Project: Dementure Care
Client: Methodist Homes for the Aged
Value: £15,000
Duration: 4 weeks

The structural alteration of an existing office into an en suite bathroom and bedroom for elderly dementia care.
For full project details click here

Dementia care project for Methodist Homes for the Aged

Project: Medical Centre Refurbishment
Client: Newham NHS PCT
Value: £150,000
Duration: 10 weeks

This project consisted of a full external and internal refurbishment programme to accommodate ‘change in use’ and other facilities over the basement, ground floor and first floor.
For full project details click here

 

Medical Centre Eastham
Back to top