Project: New 3T MRI and Casualty Plus Suite with associated works
Client: Hospital of St Johns & St Elizabeth
Value Range: £550,000
Duration: 16 weeks overall
These projects were secured following open market competitive tender and it was decided to phase and combine the projects due to their close proximity.… The project involved strip out works, structural remodelling, diversion of existing services, new construction installation and full fitting out before client phased handovers.Works were also coordinated with the MRI scanner specialist contractor Siemens.
For
full project details click here  |
 |
Project: Basement Offices, IT Suite and Medical Records
Client: Hospital of St Johns & St Elizabeth
Value Range: £200,000
Duration: 8 weeks
These projects were secured following open market competitive tender and it was decided to phase and combine the projects due to their close proximity. This enabled the contractor to modify the detailed phasing programme, in conjunction with the on site client departments, to minimise the disruption arising from construction works for the client, who's operations were maintained throughout….
For
full project details click here  |
 |
Project: Wanstead Place Health Centre and The Diabetic Centre
Client: Redbridge PCT
Value Range: £250,000
Duration: 10 weeks (including works out of hours)
Wanstead Place involved a general strip out of the existing kitchen, electrical and heating systems, and structural remodelling of the reception area. The new works included; reception area and counter, new heating services, kitchen, full
rewiring for small power, data, fire alarm, intruder and lighting. New flooring and
decorations throughout.… The Diabetic Centre works were focused on the provision of a new reception area with new counter, fire shutters, data, lighting and small power. Also decorations and new flooring.…
For
full project details click here  |
 |
Project: Stem Cell Unit conversion and refurbishment - Edgware Community Hospital
Client: Barnet Primary Care NHS Trust
Value Range: £70,000
Duration: 4 weeks
This project consisted of a full internal refurbishment programme to accommodate a 'change in use' to air conditioned offices. Internally, prior to install works, the area was deep cleaned with decommissioning of specialist plant equipment.… Work included new offices, kitchenette, toilets, server/print room, new heating and lighting throughout.…
For
full project details click here  |
 |
Project: Patients cafeteria, dinning room and internet cafe
Client: West London Mental Health NHS Trust
Value Range: £400,000
Duration: 20 weeks
The works involved the construction of two separate single storey extensions within enclosed courtyards to form an internet cafe and separate dinning hall, internal alterations to existing building to form a cafeteria and ancillary accommodation…. The staff and patients remained in occupation surrounding the courtyards for the duration of the project….
For
full project details click here  |
 |
 |
Project: Upgrade of theTrevor Gibbens Unit
Client: Kent and Medway NHS and Social Care Partnership Trust
Value Range: £800,000
Duration: 20 weeks
Trevor Gibbens is a medium secure unit. The project involved new external security fencing with 'Alumasc' eaves and gutter protection, lighting, CCTV, internal locking system, 'Pinpoint' attack and nurse call system, 'Crime Shield' protective screens, new 'KABA' entrance doors and screens, new mains power supply, internal doors, redecoration, ….
For
full project details click here  |
 |
 |
Project: Internal refurbishment of Health Centre at Fullwell Cross, Ilford, Essex
Client: Redbridge PCT
Value Range: £95,000
Duration: 8 weeks (mainly night works/weekends)
The works included the replacement of the existing reception counter, new partitioning, suspended ceiling, lighting, data, power, induction loops, replacement kitchen, new flooring, redecoration….
For
full project details click here  |
 |
 |
Project: Internal alterations and refurbishment
Client: Central and North West London NHS Foundation Trust
Value Range: £100,000
Duration: 9 weeks
The adaptation and refurbishment of the ground and first floor of the existing clinic to provide office space for new Child and Adolescent Mental Health Services. The works included removal of existing partitions, inserting new steel beams and columns, adapting mechanical and electrical services, new reception area, flooring, decoration and two new windows on external elavation….
For
full project details click here  |
 |
 |
Project: Office refurbishment in Bromley and Bexleyheath, Kent
Client: Oxleas NHS Foundation Trust
Value Range: Combined £100,000
Duration: 4 weeks each
Pembury successfully tendered for the office refurbishment in two separate buildings. The works involved the demolition of load bearing masonary partitions, new steel works within the buildings, new partitioning, suspended ceilings, lighting, data, small power, fire and intruder alarms, flooring and redecoration….
For
full project details click here  |
 |
 |
Project: External works
Client: Redbridge PCT
Value Range: £100,000
Duration: 8 weeks
The works involved the removal and reinstatement of 900 square meters of car parking, fencing, new bin store construction, traffic entry barrier, external lighting, repairs, decoration to external windows and doors, lamp posts, road markings. The centre remained operational through out the complete project, with works phased to avoid disruption to patients and staff….
For
full project details click here  |
 |
 |
Project: Internal refurbishment of a doctors surgery
Client: NHS City and Hackney
Value Range: £90,000
Duration: 4 weeks
The works included internal strip out, new partitions, floor coverings, new sterile WHB, worktops, new kitchen and bathrooms, redecoration, minor small power, lighting, alarms, gym area. The building was vacant over three floors and we had upto twenty-five opertives working to complete….
For
full project details click here  |
 |
 |
Project: Various
projects at Oakleigh Road Health Centre, Oaklane Children's Centre and
Edgware Community Hospial - Walk in Centre
Client: Barnet PCT NHS Trust
Value Range: £11,000 to £35,000
Duration: As programmed
Works included: Oakleigh Road Health Centre – the remodelling of the entrance
area, a new reception area and refurbishment works to consultant and treatment
rooms. The works were carried out whilst maintaing full client operational
services. Oaklane Children's Centre – the main roofs were prepared and
relaid. Edgware Community Hospital – renewal of base screed and soft flooring.
For
full project details click here  |
|
 |
Project: Internal
and external refurbishment and fit out of Nash College, Bromely, Kent
Client: Liability, the new face of
John Grooms and the Shaftsbury Society
Value Range: £270,000
Duration: 10 weeks
The project was secured following an open market competive tender against
4 other contractors. The works included demolition of concrete canopies;
removal of asbestos; complete strip out of reception, communial areas and
18 bathrooms used by disabled students; replacement new windows; complete
render of external elevations; refurbishment of bathrooms; new reception;
decoration; lighting; ventilation and air conditioning.
For
full project details click here 
|
|
 |
Project: External
facade refurbishment of Nash College, Bromely, kent
Client: Liability, the new face of
John Grooms and the Shaftsbury Society
Value Range: £110,000
Duration: 4 weeks
The project involved the removal of existing Crittal windows and replacement
with new UPVC; complete render of external elevations with one coat Webber
Render; new fascia, guttering and down pipes; brick cleaning; redecoration;
new signage, lighting and services; curtain walling; lightening conductor
works.
For full project details click here  |
|
 |
Project: Forming
structural openings (Nash College, Bromely, Kent)
Client: Liability, the new face of
John Grooms and the Shaftsbury Society
Value Range: £20,000
Duration: 1 week
The project involved the soft strip of existing fixtures and relocation
of gas, water and electrical services; forming a 4 meter wide structural
opening through a 500mm wide load bearing masonry wall; support of existing
structural slabs, "temporary works design" and a saw cut trench
through ground floor slab; a steel box beam was installed and temporary
propping removed.
For full project details click here  |
|
 |
Project: Kitchen
Client: NHS Trust
Value Range: £53,000
Duration: 2 weeks
The project involved the removal of existing kitchen, design and install
complete new industrial kitchen, new Altro white rock walling and flooring,
redecoration & carpentry items, new electric, small power and ventilation.
For full project details click
here  |
|
 |
Project: Alterations
to Intensive Care Unit and Coronary Care Unit
Client: Maidstone and
Tunbridge Wells NHS Trust
Value Range: £60,000
Duration: Phased over
8 weeks
The work included alteration to the existing 3 bed ICU, modify and construct
segregation room, alter electrical services, mechanical and piped medical
gases and additional CCU bed space.
For full project details click
here  |
|
 |
Project: The
refurbishment of offices, kitchens, and rest rooms
Client: NHS Mental Health
Trust
Value Range: £40,000
Duration: 3 weeks
The work included stripping out of walls, doors, ceilings, floors, mechanical & electrical
services, installing partitions, kitchen, floors, ceilings, electrics,
nurse call and alarm systems.
For full project details click
here  |
|
 |
Project: New
bin stores
Client: Oxleas NHS Trust
Value Range: £60,000
Duration: 6 weeks
The project was secured following a traditional competitive tender with
4 other contractors. The project included the removal of existing structures,
new foundations, rerouting deep drainage, electrical services, brick work
and trussed roof.
For full project details click
here  |
|
 |
Projects: Mill
Hill Clinic, Holly Park Clinic and Edgware Community Hospital / Oakleigh
Road Health Centre / Westgate Annexe Roof
Client: Barnet PCT
Value Range: £5,000
to £55,000
Duration: As programmed
Pembury were awarded a number of contracts after competitive tenders. The
works varied from refurbishment to replacement roof covering.
For full project details click
here  |
|
 |
Project: The
Project Surgery
Client: The Project Surgery
(Newham PCT NHS)
Value: £120,000
Duration: 24 weeks
The works consisted of a fully fitted out two storey extention and external
landscaping to the existing premises. All the works completed with the
surgery remaining open. Completed to budget and ahead of programme.
For full project details click
here  |
|
 |
Project: Refurbishment
of Piercy Day Hospital
Client: Camden & Islington
NHS Foundation Trust
Value: £60,000
Duration: 4 weeks
The refurbishment of various consultants offices and the construction of
a multi purpose day room. The works were carried out in occupation, with
great care to respect the well being of day patients and staff.
For full project details click
here  |
|
 |
Projects: Structual
alterations to E Block
Client: West London Mental
Health NHS Trust
Value Range: £65,000
Duration: 4 week
Pembury successfully tendered for the structual refurbishment of the vacant
E Block at St Bernard's wing of Ealing Hospital.
For full project details click
here  |
|
 |
Project: Refurbishment
of Ward, Kent and Sussex Hospital
Client: Maidstone and Tunbridge
Wells NHS Trust
Value: £75,000
Duration: 5 weeks
The project was completed in normal hours, with occupied and functional
wards below and adjacent. The reduction of noise, dust and vibration was
of great concern.
For full project details click
here  |
|
 |
Projects: Refurbishments
of Ante Natal Ward / Paediatrics Offices / Communicatiions Centre / Neo
Natal ward / Microbiology
Client: The Whittington
Hospital NHS Trust
Value Range: £5,000
to £60,000
Duration: As programmed
Invited by the Estates & Facilities Directorate to tender for a range
of refurbishments and successfully secured a number of contracts.
For full project details click
here  |
|
 |
Projects: Various
projects at Medic House Surgery and South Green Surgery
Client: South West Essex
NHS PCT
Value Range: £1,000
to £15,000
Duration: As scheduled
The works included site clearance, concrete repairs to the car park and
service yards, repairs to existing timber fences and installation of new
steel security fencing and gates.
For full project details click
here  |
|
 |
Project: New
Renal Unit
Client: Hospital
of St John & St Elizabeth
Value: £500,000
Duration: 10
weeks
This turnkey project was awarded to Pembury after competitive tendering.
The works included complete strip out of all engineering services, existing
water plant, toilets, workshop, ward area, nurse stations and kitchenette.
The supply and installation of new water treatment plant room, reception
area, kitchenette, new Flatwall media panels, lighting, suspended ceiling,
glazed screens, solid partitioning and soft flooring.
For
full project details click here  |
|
 |
Project: Pathology
Department Refurbishment
Client: Hospital of St
John & St Elizabeth
Value: £65,000
Duration: 6 weeks
The project was carried out in several phases, to allow the Pathology Department
to continue its normal day to day activities.
For full project details click
here  |
|
 |
Project: New
Admissions Office
Client: Hospital of St
John & St Elizabeth
Value: £30,000
Duration: Out of hours
working over 2 weekends
Pembury were asked by the Estates Department of Hospital of St John & St
Elizabeth to space plan and fully refurbish the existing Admissions Office.
For full project details click
here  |
|
 |
Project: Dementure
Care
Client: Methodist Homes
for the Aged
Value: £15,000
Duration: 4 weeks
The structural alteration of an existing office into an en suite bathroom
and bedroom for elderly dementia care.
For full project details click
here  |
|
 |
Project: Medical
Centre Refurbishment
Client: Newham NHS PCT
Value: £150,000
Duration: 10 weeks
This project consisted of a full external and internal refurbishment programme
to accommodate ‘change in use’ and other facilities over the
basement, ground floor and first floor.
For full project details click here 
|
|
 |