Project: Lecture theatres, teaching rooms, toilet block refurbishments
Client: Goldsmiths University of London
Value Range: c£280,000
Duration: 8 weeks

As a new Framework Contractor to Goldsmith, Pembury were invited to tender for number of projects to be carried out during the summer months. Pembury secured a number of these projects, all of which, were to be carried out concurrently, but with phased handovers. The works varied from light decorations, to full strip out and reinstallation of new mechanical, electrical and plumbing services, door access controls, suspended ceilings, new flooring, new fire doors and ironmongery.…
For full project details click here
Project: Office refurbishment in Bromley and Bexleyheath, Kent
Client: Oxleas NHS Foundation Trust
Value Range: Combined £100,000
Duration: 4 weeks each

Pembury successfully tendered for the office refurbishment in two separate buildings. The works involved the demolition of load bearing masonary partitions, new steel works within the buildings, new partitioning, suspended ceilings, lighting, data, small power, fire and intruder alarms, flooring and redecoration….
For full project details click here
Project: Olympus House Ground Floor Fit Out
Client: Kellogg Brown and Root (KBR)
Value Range: £50,000
Duration: 3 weeks

The works comprised, demolition and strip out of existing partition layout, new internal glazed partitioning, doors, suspended ceilings, air coditioning, electrical (power and lighting), soft floor finishes, verticle blinds and two kitchenette areas and decoration. The works were completed within budget to a very demanding timescale and coordinated on site with other direct client contractors.
For full project details click here

Project: Various projects at Oakleigh Road Health Centre, Oaklane Children's Centre and Edgware Community Hospial - Walk in Centre
Client: Barnet PCT NHS Trust
Value Range: £11,000 to £35,000
Duration: As programmed

Works included: Oakleigh Road Health Centre – the remodelling of the entrance area, a new reception area and refurbishment works to consultant and treatment rooms. The works were carried out whilst maintaing full client operational services. Oaklane Children's Centre – the main roofs were prepared and relaid. Edgware Community Hospital – renewal of base screed and soft flooring.
For full project details click here

Project: Mezzanine and Office Construction
Client: Edenbridge Accident Repair Centre
Value: £40,000
Duration: 6 weeks

Pembury were awarded this contract after competitive tender. The works involved the construction of a new mezzanine floor for office accomodation and the refurbishment of the existing office and reception area, together with an upgrade of existing staff canteen.
For full project details click here

Project: Fitting out of new offices
Client: Oxleas NHS Trust
Value: £190,000
Duration: 8 weeks

The project was secured following a two stage competitive tender. The works included strip out of existing bathrooms and kitchens; install new fire and sound rated partitioning; new fire rated doors and suspened ceiling; new ventilation and air conditioning; vinyl and carpet tile flooring; new kitchens and bathrooms.
For full project details click here

Project: Internal and external refurbishment and fit out of Nash College, Bromely, Kent
Client: Liability, the new face of John Grooms and the Shaftsbury Society
Value: £270,000
Duration: 10 weeks

The project was secured following an open market competive tender against 4 other contractors. The works included demolition of concrete canopies; removal of asbestos; complete strip out of reception, communial areas and 18 bathrooms used by disabled students; replacement new windows; complete render of external elevations; refurbishment of bathrooms; new reception; decoration; lighting; ventilation and air conditioning.
For full project details click here

Project: External facade refurbishment of Nash College, Bromely, kent
Client: Liability, the new face of John Grooms and the Shaftsbury Society
Value: £110,000
Duration: 4 weeks

The project involved the removal of existing Crittal windows and replacement with new UPVC; complete render of external elevations with one coat Webber Render; new fascia, guttering and down pipes; brick cleaning; redecoration; new signage, lighting and services; curtain walling; lightening conductor works.
For full project details click here

Nash College, Bromely, kent

Project: Forming structural openings (Nash College, Bromely, Kent)
Client: Liability, the new face of John Grooms and the Shaftsbury Society
Value: £20,000
Duration: 1 week

The project involved the soft strip of existing fixtures and relocation of gas, water and electrical services; forming a 4 meter wide structural opening through a 500mm wide load bearing masonry wall; support of existing structural slabs, "temporary works design" and a saw cut trench through ground floor slab; a steel box beam was installed and temporary propping removed.
For full project details click here

Nash College, Bromely, kent
Project: Office refurbishment
Client: DHL International
Value: £60,000
Duration: 4 weeks

The work included removal of ceilings, floors, air conditioning, installation of new partitions, floors, new air conditioning, lighting, alarms and redecoration.
For full project details click here
DNL International

Project: The refurbishment of offices, kitchens, and rest rooms
Client: NHS Mental Health Trust
Value Range: £40,000
Duration: 3 weeks

The work included stripping out of walls, doors, ceilings, floors, mechanical & electrical services, installing partitions, kitchen, floors, suspended ceilings, electrics, nurse call and alarm systems.
For full project details click here

NHS Mental Health Trust

Projects: Mill Hill Clinic, Holly Park Clinic and Edgware Community Hospital / Oakleigh Road Health Centre / Westgate Annexe Roof
Client: Barnet PCT
Value Range: £5,000 to £55,000
Duration: As programmed

Pembury were awarded a number of contracts after competitive tenders. The works varied from refurbishment to replacement roof covering.
For full project details click here

Barnet Primary Healthcare NHS Trust

Project: Refurbishment of Piercy Day Hospital
Client: Camden & Islington NHS Foundation Trust
Value: £60,000
Duration: 4 weeks

The refurbishment of various consultants offices and the construction of a multi purpose day room. The works were carried out in occupation, with great care to respect the well being of day patients and staff.
For full project details click here

Piercy Day Hospital

Project: Structual alterations to E Block
Client: West London Mental Health NHS Trust
Value: £65,000
Duration: 4 week

Pembury successfully tendered for the structual refurbishment of the vacant E Block at St Bernard's wing of Ealing Hospital.
For full project details click here

West London Mental Health NHS Trust

Project: Refurbishment of main reception
Client: DHL International
Value: £50,000
Duration: 2 week

The project was completed in 2 weeks, only working out side normal hours. The main reception was fully operational at all times.
For full project details click here

DHL International

Project: Refurbishment and fitting out of 6th floor offices
Client: Go Ahead Group PLC
Value: £150,000
Duration: 3 week

The project was secured following a two stage competitive tender and was completed in 3 weeks, working 7 days per week to meet the clients planned moving in date.
For full project details click here

Go Ahead Group PLC

Project: Brampton House Coffee Shop Fit Out
Client: Hospital of St John & St Elizabeth
Value: £32,000
Duration: 4 week

This project was awarded after competitive tender and consisted of design and construction of the display counters and units with granite work tops and oak vaneers.
For full project details click here

Hospital of St John & St Elizabeth

Project: Refurbishment and Fit Out
Client: Vintners Hall Livery Company
Value: £25,000
Duration: 2 week

Light refurbishment, including new lighting, small power, fire/intruder alarms, flooring, new office, door furniture and redecoration.
For full project details click here

Vintners Hall Livery Company

Project: Office Fit Out
Client: DHL Express
Value: £25,000
Duration: 1 week

To design, supply and construct 6 new cellular offices, meeting room and conference facility.
For full project details click here

DHL Express

Project: Office Refurbishment
Client: Price and Myers
Value: £80,000
Duration: 6 weeks

The refurbishment of the 2nd and 3rd floor of Price and Myers' new offices in Newman St, London.
For full project details click here

Price and Myers